The existing floor tiles within the stairwells
and lift foyers have failed slip tests and are currently a slip
hazard and H&S risk. The works are to carry out the
installation of a non-slip Sika Staircoat Reinforced Waterproofing
System to all stairwells & lift foyers on all levels 1 –
7, including the Sainsbury’s link bridge on Levels 5 & 6.
The thresholds to the existing steel doors may also need to be
adjusted to allow for the new anti-slip coating which is to be
applied over the existing floor tiles.
Health & Safety Requirement
None
Scheme of Delegation to Officers October
2024
Joint Assistant Director – Assets and Property
Para 2.8.7 To take any action in relation to procurement and the
letting of contracts for goods and services, within approved
budgets.
Where specified in Contract Procedure Rules, JSD Finance and JSD
Legal & Democratic Services
Publication date: 06/12/2024